Levent Ozturk
Enter
DO-254 Artifacts (Evidence) Lifecycle Traceability DAL: Design Assurance Levels A:Catastrophic B: Hazardous C: Major D: Minor E: No DER: Designated Engineering Representative Self Internal DER Consultant DER Auditor DER (Aircraft Integrator) CEH: Complex Electronics Hardware PLAN ------- PHAC: PLan HW Aspects of Certification Lifecycle (HW) Plan PHAC Safety Assesment (DAL,FIT,Redundancy,SEU Mitigation) CM PROCESS --------- Validation CM Process Assurance: Review, Checklist Certification FAA Mandated Reviews ----------------------- SOI: Safety of Involmnet SOI 1: HW Plan Review SOI 2: HW Design Review SOI 3: HW Verification and Validation Review SOI 4: HW Final Review TOOL Certification --------------------- Assessment: Run against Qualification
All the material listed and linked at this World Wide Web domain are strictly private property and copyrighted. © Copyright -∞-∞ Levent Ozturk. All rights reserved. Reproduction or use of any material, documents and related graphics and any other material from this World Wide Web server is strictly prohibited. Site Map